This certification requires the Designer to certify that all the provisions contained in the checklists are complete and accurate. content from anything that may be linked to the State of NJ site for any The State of NJ site may contain optional links, Have utility agreement plans been submitted and approved? Delaware Courts This is a plan view of footings and piles. The SDG(s) will provide a printed copy of their revised Project Specific SIportions and FDS review comments to Quality Assurance for resolution and for the DPS&E development and Certification by the Designer (outstanding issues will be resolved prior to submitting the DPS&E). Is ROW available, if advanced utility relocation is required? Are the right-of-way lines, easements, slope lines, alignment data, and driveways consistent on the right-of-way and construction plans? MMXVI Delaware.gov, Approved Alternatives to Standard Details. (answer N/A if the permit is not required), a. US Coast Guard Bridge Permit, b. US Army Corps of Engineers Permit, e. NJDEP Waterfront Development Permit, f. NJ Pinelands Commission Public Development Approval, g. NJFWPA Freshwater Wetlands Permit, h. NJDEP Coastal Wetlands Permit, i. NJDEP Stream Encroachment permit, j. Green Acres/ State House Commission Approval, l. Water Quality Certificate, m. D&R Canal Commission Approval, n. NJFWPA Transition Area Waiver, o. Other ______________ (a Dam Safety Permit, Water Lowering Permit, or other miscellaneous permit). The EP sheets will be checked by the E-Team for accuracy/ consistency with commitments, constraints and permit conditions during the plan development stages and especially during the Environmental Reevaluation (for Federal projects) prior to requests for FHWA authorization for ROW and construction. information, services and/or content from other we bsites operated by third Instead, the notation should read (10 spaces @ 6' 2" = 61' 8"). You are cautioned not to assume that any information has been updated beyond the Dated Date unless a document expressly states that it constitutes an update. Has the item, Clearing Site for Structures been established for removal of structures other than bridges? in addition to names, is required. By choosing to continue and view the information on the Investor Page you are acknowledging that you have read and understand and accept these Terms of Use. NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. Further, those websites may have their own terms of use and policies which you should review prior to availing yourself of information on those sites. State Regulations Jun 2002 - Sep 202018 years 4 months. These might include the size of bolts or rivets, type of steel, weld symbols and sizes, structural steel paint system designation and finish coat color, notes concerning Notch Toughness, Fracture Control Plan, and welding inspection testing symbol requirements. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. The State of NJ site may contain optional links, required for the PDA. Right of Way information and Design Traffic Data. ), Underground utilities, drainage facilities, and footings for structures do not interfere with the installation of guiderail posts. h. Are there any utility line shut down restrictions during certain months? Any financial document contained on the Investor Page is marked with a date (the Dated Date) and speaks only as of that Dated Date, which may be prior to the date it is posted on this website. Basis of Payment - describes the exact name and pay unit. Have tidal waters and riparian grant issues been addressed? Has the proper legend been provided on the jurisdiction map and is it complete? Titles shall be in accordance with the current. 8. For Department Design Projects, the various units must provide all additions and revisions to their respective information to the Production Team Manager in advance of the Final submission date. Will adequate roadway width available be maintained during the shifting of breakpoints or lanes? Have ties to the control line been provided outside the area of disturbance? Translate is an online service for which the user pays nothing to obtain a Copies of the list are sent to the designer and Quality Assurance. Is the information on the structural plans consistent with the Foundation report? The following note shall be indicated on this sheet: Files for 2009 forward are also presented in MicroStation (dgn) format. purported language translation. 2018 Roadway Standard Drawings - Index of Sheets. Has coordination between contract documents been conducted to insure the Bridge, Roadway, Electrical, etc. Please turn on JavaScript and try again. Tax Center If required, have temporary traffic signals been designed and shown on the contract plans? This may include references to other sections of the Standard Specifications. The purpose of these actions is to ensure that environmental commitments and other sensitive environmental or land use issues which could affect the design, right of way or construction of a project are properly tracked and included into construction plans so that they may be ultimately implemented by the Resident Engineer/contractor. Diaphragm Details The following information is to be provided on the EP Sheets: Specifications compliment the plans and together they provide information for the contractor to complete the work and for the Department to control the work of a construction project. Has non-vegetative surface been included under guiderail? Google List of all new and revised items incorporated into the project since the previous submission. to perform the work without affecting traffic, utilities and properties? Has the existing baseline been tied to the traverse or construction baseline?. Privacy Policy Have the shoulder widths, cross slopes and pavements, and location of utilities (poles, etc.) Environmentally Sensitive Parcels (ESPs) such as contaminated property, parkland, historic sites, etc. Does the environmental plan sheet include all environmentally sensitive parcels, permits, permit expiration dates and specific restrictions that affect the construction schedule? 6. Google Do the construction plans include all environmental commitments? Bridge Design Specifications Design Manual, Part 4 Structures (DM-4) (Pub. Has the designer prepared and submitted an approved Geotechnical Foundation Engineering Report, Geotechnical Roadway Engineering and/or Rock Engineering Report - including structural foundation selection, bearing capacities, settlement, structural foundation stability (external & internal stability)? The EP sheets are initially based on the information provided through the above list. As detailed design information is generated and when construction permit conditions become clearly defined, the EP sheets are developed and updated among the Project Manager, designer and E-Team. This manual has been prepared to provide Washington State Department of Transportation (WSDOT) bridge design engineers with a guide to the design criteria, analysis methods, and detailing procedures for the preparation of highway bridge and structure construction plans, specifications, and estimates. Standard Construction Details - Delaware Department of Transportation Translate Delaware Department of Transportation Standard Construction Details The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). Have at least 2 benchmarks per plan sheet been provided on locations which will not be disturbed by construction? Pile type, size, and the associated material properties. Division 06 - Asphalt Bases and Pavements. Shear Connector Details E-mail / Text Alerts **** Minimum Pile Tip Elevation: A minimum pile penetration should only be specified if necessary to ensure that all of the applicable limit states are met, e.g., lateral deflection, uplift, scour, down drag and pile group settlement. Use of bridge numbers, overhead sign structure numbers, wall numbers, culvert numbers, etc. Materials - specifies the materials to be used and how they will be tested. All dimensions required to construct piles and footings Mr. Bham is a motivated Civil/Highway Engineer with 11 years of work experience in Transportation and Land Development projects. Real Time Traffic It indicates: This sheet is a schematic outline with general information necessary to assist bidders in determining the extent of the work. Jan 2015 - May 20161 year 5 months. Translate is an online service for which the user pays nothing to obtain a Gross Receipts Tax Any single revision and addition that contains more than thirty-five words shall be submitted with an electronic file. Locations Directory 2021 2020 2018 Have permits or agreements required with other authorities been obtained - Turnpike, A.C. Expressway? The University was ranked 5th place and was globally placed 801-1000 by (THE) World . Space between the letters shall be one-half the width of the widest letter, and space between the lines of lettering shall be one-half the height of the tallest letter. There may be other documents containing relevant, material information regarding NJTA which may be available from other sources, including, but not limited to, www.emma.msrb.org. The achievement of certain results or other expectations contained in such forward-looking statements involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements described in or expressed or implied by such forward-looking statements. A scale of 1" = 100' or 1" = 200' is desirable. Has the proper allocation of jurisdictional apportionment been provided and is it correctly shown on the jurisdiction map and complete? Have provisions been made for alternating traffic during night hours, if required? These must match the plans and proposal. the NJDOT will consider the needs of all road users and neighbors. This is usually a section taken through the plan view. The Investor Page is provided for the users convenience, but may not provide all information that may be of interest or material to investors. Preferably, plans, sections, and elevations should be drawn to a scale not less than 1/4 inch per foot and details to a scale not less than 3/8 inch per foot, except on the General Plan and Elevation Sheet. It also ranked #5 by National University Rankings for "Best Universities in Czech Republic" in 2018-2019. The purpose of the Environmental Plan Sheet is to provide the Project Manager, designer, Resident Engineer and construction contractor an easy way to monitor, update and implement during construction all environmental commitments and permit conditions on a project. It will also graphically indicate the location of any sensitive environmental resources, land uses and/ or other properties. Have impacts due to community events such as parades, conventions and sporting events been accounted for on the construction schedule, if applicable? content from anything that may be linked to the State of NJ site for any Standard Sheets are available both in the US Customary units accessible below and in Metric units. Refer to Guide Plate 3.17-1 of the. -Read Full Dislaimer. All updated and revised non-standard and standard electrical details are included. and to the roadway ahead of and beyond the construction area, Show signage for each stage of construction, including construction signs, final Contractors are contractually required to follow the "New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2019" (pdf 5.2m) and applicable Special Provisions as part of the Contract. Have any contaminated soils or sites on the project been identified? The final design submission shall be submitted to the Project Manager, and shall include: Finalize earthwork summary according to final earthwork quantities. April 2015 Edition: Initial Release (PDF); Annotated Version ** Quality Assurance Checklists (12/19) (PDF) Fax: (775) 888-7101. Estimated Pile Tip Elevation Extent of removal and staging A plan view of the abutment which includes: A front view of the abutment and walls which includes: Typical sections through abutment walls which include: A side view of the pier which usually indicates: An end view of the pier. Have all fixed objects been located outside the clear zone or protected by guide rail, etc.? Google Phone: (775) 888-7070. Las Vegas, Nevada, United States. Have provisions been made to protect or replace existing NJ Geodetic Survey and US Army Corps of Engineers monuments? It may also include additional clarification on what additional work is or is not included. Minimum Pile Tip Elevation (only specified if necessary)**** Special provisions combine the current Standard Input (SI) with the project specific information. Any other information which, in the judgment of the engineer, will be of value to all concerned. General Assembly The transmittal memo must note if there are none. Language should not be duplicated in the Special Provisions if it is contained in the notes on the plans. Notes which reference applicable permits, their expiration dates and, if relevant, time or seasonal constraints to any construction activities. Nominal Axial Compression Resistance -Read Full Dislaimer. Structure numbers shall also be shown in the index. General Notes indicating design criteria and hydrologic data. Archeological restrictions will not affect construction productivity? All items of work must be covered by either the approved Specifications or by the Special Provisions. The Specifications prepared for items of work should include, as applicable, the following sections: Prior to developing any non-standard items, the Designer should ensure that no standard items and specifications are applicable for the intended work under the project. Do the electrical plans conform to Sections 11 and 12 of the NJDOT Design Manual - Roadway, the Sample Plans and the Standard Electrical Details? Calculations are included for the following: g. Optical budget loss analysis, Foundations for ITS elements are included in the Geotechnical Foundation Engineering Report, Electric Service Inquiries are confirmed in writing, Traffic signal timing plans are complete for AM, off peak, and PM periods. Have all the requirements of the "Guidelines for Landscape Architectural Consultants" been met? of NJ site nor its operators review any of the services, information and/or information, services and/or content from other we bsites operated by third plans are consistent? Sensitive resources/ land uses to be identified on the EP Sheets include: historic sites, parklands, wetlands, regulated streams/ floodplains, contaminated properties, conservation lands, endangered/ threatened species habitat, daily or seasonal constraints and any others which may pertain to the specific project. The user is on notice that neither the State Delaware State Code The data files and two printed copies of the Engineers Estimates, in accordance with the Construction Cost Estimating Guidelines. The State of NJ site may contain optional links, Division 02 - Earthwork. Has time been provided for asbestos removal work in the project schedule? Information required to be provided pursuant to NJTAs continuing disclosure undertakings entered into pursuant to Rule 15c2- 12(b)(5) of the Securities and Exchange Commission is available on the Electronic Municipal Market Access (EMMA) system of the Municipal Securities Rulemaking Board located at www.emma.msrb.org. Has adequate room been provided for equipment, trucks, cranes, etc. Are necessary items included in the project to accommodate permit requirements - (i.e. -Read Full Dislaimer. These drawings standardize fabrication, installation, and construction methods for specific items of work, and . in-depth review of NJDOT Phase II inspection reports of scour critical bridges . It is hereby certified that the CONSULTANT has performed the necessary quality control and quality assurance tasks for the project and specifically for those applicable items as shown on the attached checklist. Translate is an online service for which the user pays nothing to obtain a parties that are provided as a convenience, such as Google Translate. 1263 S. Stewart Street. Specifications - Special Provisions Construction Standards And Details Construction Standards And Details It looks like your browser does not have JavaScript enabled. The minimum information is: Each drawing has been prepared under the direct supervision of a professional engineer, licensed in the state of Washington, knowledgeable in the specialized field of civil engineering depicted in that drawing. Reconstruction replaces over a foot of the roadway below the street's surface and usually includes reconstruction of the curbs and sidewalks as well. (Roadway Excavation, Rock or Roadway Excavation, Earth are not recommended), All non-standard items and specifications have been approved by the Project Manager, All non-standard proprietary items have been approved by the FHWA, Revisions and additions have been marked on the Project Specific SI's and/or additional Special Provision inserts provided (with electronic files to each respective Specifications Development Group), Specifications/details have been included for all non-standard work items, Additional estimate documentation has been provided where additions or revisions made to a standard item could substantially revise the cost, The specifications for a Lump Sum item clearly spell out the work which will be included in the payment for the item and additional estimate documentation has been provided, Non-standard item numbers have been approved by Quality Assurance, including revisions to existing standard items, A final Engineer's Construction Cost Estimate has been submitted, Requirements of the Initial Design Submission QA Checklist have been satisfied. The drawing files below are the most current revisions. Do plans and/or specifications include the statement that the contractor must maintain access to properties at all times during construction? University of South Bohemia Ceske Budejovice, ranked #930 by World University Rankings in 2018-2019. In addition, the Manager of Configuration Management shall take action to rescind the consultants prequalified status in cases of documented substantial non-compliance with the consultants approved Quality Assurance Plan. 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2016) 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2015) Manual and Publication Sales Order Printed Specification Manuals Resources Notice of Disclaimer Contact Staff Phone: 701-328-2590 Top view of the centerlines of the beams and diaphragms. All characters shall be open, bold, uniform and formed with a dense but not wide line. Do the plans and specifications provide for clean-up? purported language translation. The firms project manager and a principal of the firm must sign this certification. The full set of plan sheets, including project specific standard details that are modified, nonstandard details, as well as all details revised by BDC issued subsequently to the release of the latest standard detail booklet issued by the Department, are to be consecutively numbered. Are there architectural plans for partial demolitions in the project? The project limits are shown on the plans. E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. The Investor Page is part of the official website of NJTA. Soil erosion and sedimentation control measures (e.g. State Employees Graphic Bar Scales shall be shown on Plan Sheets. Division 07 - Concrete Pavement and Shoulders. Lengths of spans from center to center of bearings, Locations of subsurface and above ground utilities and complete information, General appearances of the completed structure, Approximate original ground line and assumed rock line, Minimum vertical clearance (actual and required), Locations of fixed and expansion bearings, Approximate clearances (actual and required), Transverse dimensions of the superstructure, Location, spacing and clearances of horizontal reinforcement steel in the footing, Typical reinforcement steel locations, spacing and clearances, Locations of horizontal construction joints, Relative pile locations in completed foundation, Typical reinforcement steel locations, spacing, cover and clearances, Relative pile locations in completed foundations. Has the designer properly incorporated the geotechnical design and recommendations given in the Geotechnical Foundation Engineering Report, the Geotechnical Roadway Engineering Report and/or Rock Engineering Report into the plans and specifications? I have read the foregoing Terms of Use and expressly agree to each of the terms; I also understand that, as indicated above, official forms of disclosure documents are available elsewhere and that material information important to the making of informed investment decisions may have been posted elsewhere. The respective SDG(s) will review the Comment Resolution and/or meet with the Project Manager, the QA Unit, and the Designer to assist in resolving any outstanding issues. Reference to the Standard Drawings should be included in the Index of Drawings shown on the General Plan and Elevation Sheet. Has reduced productivity due to levels protection been included in the contract time? Standard Construction Details. water quality-oil water separator, turbidity barrier)? Street Reconstruction Full reconstruction of streets provides long-term upgrades to the roadway and the underlying infrastructure, addressing serious issues related to a street's condition and design. These documents are also available on the Departments Web site and through the Engineering Documents Unit. Route and Section number under which the bridge was built. Have lane restrictions been noted in the utility agreement plans? Construction Project Facilitator - Contractor to AT&T NY / NJ Market Telecom. New Site Builds Black & Veatch Aug 2018 - Oct 20191 year 3 months Greater New York City Area Our Division delivers. Any single revision and addition that contains more than thirty-five words shall be submitted with an electronic file on a virus-free disk. Reinforcement bar lists - These are used in computing net theoretical mass. ), Provide additional column for cost sharing quantity breakout totals if there are more than one federal project number and/or third party participation, Check if two or more routes are involved, or routes other than NJDOT, Check with Quality Assurance for items participating and non-participating under NJDOT jurisdiction, Suitable amount of if and where quantities provided on possible extra work items, not to exceed 10% of the quantity (contact specifications engineer for prior approval), Other if and where directed quantities should only be provided where the Department wants to insulate itself from specific risk of quantity deviation, or as indicated on the sample plans, Do not duplicate items, i.e., reset castings vs. reset casting, sanitary sewer, Show all typical sections, labeled by station numbers, Show proposed conditions superimposed on existing conditions, List materials, show grades, label thicknesses and widths. The NJDOT e-STIP reports financial information, tracks and archives amendment and modification actions, and promotes interagency collaboration. silt fence, hay bales, turbidity barriers, temporary detention basins, etc.). Relative locations of existing bridges to be altered or demolished. If the STATE determines that any design submittal items noted in the QA checklist prepared by the CONSULTANT are unacceptable due to errors, omissions, or failure to comply with the requirements of the checklist, the CONSULTANT shall correct and revise the deficiency in accordance with directions received from the STATE at no cost to the STATE. The CONSULTANT shall be liable to the STATE for all damages to the STATE caused by the CONSULTANTs negligent errors and omissions, including interest and other expenses. The details may be typical or specific. i.e. Structural Plan Development Other than as may be required by law, NJTA does not plan to issue any updates or revisions to any such forward-looking statements if or when its expectations are realized or not realized, or when the events, conditions or circumstances on which such statements are based occur and, even if issued, any such updates or revisions may not be included on the Investor Page. Use of the standards provides for more consistent estimating / bidding and control of the work by both the Department and the contractors. Many of the standard items have sufficient variability in the specifications to allow for most construction requirements. Location and identification of utilities. (For details on EP Sheets, refer to the discussion on EP Sheets - Development and Content which follows below.). Number of piles in each footing unit and total estimated length of piles in each footing unit Social Media, Built by the Government Information Center Small scale diagram showing concrete placing sequence for continuous spans. Conditions of the Stream Encroachment Permit have been incorporated in the plans, if applicable. a. Utilities - Lead Time and Relocation, c. Right of Way availability, d. Environmental - Permit Conditions/Restrictions. If the original bridge plans are available, a half-tone reproduction of the General Plan and Elevation sheet, modified to suit, should be considered for inclusion in the above Plans. Batter of piles This sheet is a schematic outline of the temporary bridge to provide bidders with minimum criteria. Has milling or removing surface pavement, which will cause a difference in grade that will affect the utilities, drainage and/or traffic been taken into account? reason. Has sufficient room been provided for entrance and exit to the work zone for equipment and materials supply deliveries? content from anything that may be linked to the State of NJ site for any There are no conflicts with proposed work - drainage, guide rail location and relocation of utilities.